
Report No: 094061R-ITCEP07V06
Page: 95 of 123
10.6. Test Result
Product Notebook
Test Item Electrical fast transient/burst
Test Mode Mode 1
Date of Test 2009/04/02 Test Site No.2 Shielded Room
Inject
Line
Polarity
Voltage
Kv
Inject
Time
(Second)
Inject
Method
Required
Criteria
Complied
to
Criteria
Result
L+N+PE
±
1Kv 60 Direct B B
PASS
LAN
±
0.5Kv 60 Clamp B B
PASS
Telec o m
±
0.5Kv 60 Clamp B B
PASS
Note:
The testing performed is from lowest level up to the highest level as required by
standard, but only highest level is shown on the report.
Meet criteria A : Operate as intended during and after the test
Meet criteria B : Operate as intended after the test
Meet criteria C : Loss/Error of function
Additional Information
EUT stopped operation and could / could not be reset by operator at kV of
Line
.
No false alarms or other malfunctions were observed during or after the test.
Comentários a estes Manuais